연구 개요 Overview
건설 프로젝트를 위한 공사비 산정 및 관리 시스템

건설 프로젝트 예산의 효율적 관리와 프로젝트의 성공은 상관관계가 있으며, 공사비 산정의 정확도는 정보의 양과 질과 관련이 있다. 건설 프로젝트 초기 단계에서는 정보 부족으로 오차 범위가 넓고 공사비 예측의 정확도가 낮은 문제가 있다. 그러나 전 생애주기 관점에서 건설 프로젝트에 가장 큰 영향을 미치는 단계는 초기 단계이다. 따라서 기획 및 계획 단계에서 공사비를 정확하게 예측하려는 노력이 중요하다.
Cost Estimating and Management System for Construction Projects

There is a correlation between the efficient management of a construction project budget and success of a construction project, and the estimating accuracy of a construction cost has relation to the quantity and quality of information..In the initial phase of a construction project, due to the lack of information, there is a problem that a margin of error is wide, whereas the accuracy of foresting construction costs is low. However, from the perspective of the entire life cycle, the most influential phase of a construction project is the initial phase. Therefore, making an effort to forecast construction costs accurately in the planning and programming phases is important.
연구 내용 Research Content
건설 프로젝트를 위한 공사비 산정 및 관리 시스템

건설 프로젝트 예산의 효율적 관리와 프로젝트의 성공은 상관관계가 있으며, 공사비 산정의 정확도는 정보의 양과 질과 관련이 있다. 건설 프로젝트 초기 단계에서는 정보 부족으로 오차 범위가 넓고 공사비 예측의 정확도가 낮은 문제가 있다. 그러나 전 생애주기 관점에서 건설 프로젝트에 가장 큰 영향을 미치는 단계는 초기 단계이다. 따라서 기획 및 계획 단계에서 공사비를 정확하게 예측하려는 노력이 중요하다.

일반적으로 기획 초기 단계에서는 연면적당 단가를 사용하고, 계획 단계에서는 실적공사비나 표준품셈을 활용하여 공사비를 예측한다. 표준품셈을 활용하여 공사비를 산정하는 경우 재료비, 노무비, 경비로 구분하여 단위면적당 비용을 산정하며, 재료비와 노무비의 경우 단위면적당 품을 사용하여 소요 수량과 비용을 산정한다. 그러나 이 방법은 실용성이 부족하다는 지적이 많다.

공사비 산정 방법뿐만 아니라 산정 과정에서도 몇 가지 문제가 발견되었다. 주요 문제는 기획 단계와 계획 단계 사이에 공사비와 예산을 지속적으로 산정하고 관리하는 체계가 없다는 점이었다.

기획 및 계획 단계에서 공공 공동주택과 청사 건축의 공사비를 효율적으로 산정·관리하기 위해, 기획/계획/기본설계/실시설계 단계별 공사비 산정 방법론과 공사비 영향 요인을 제시하였다. 또한 발주자 관점에서 공사비 산정 및 관리 프로세스를 파악하여 시스템에 적용할 수 있는 공사비 관리 지점(Cost Control Point, 이하 ‘CCP’)을 제안하였다. 공공 공동주택과 청사의 특성을 반영하여 CCP 적용을 위한 공사비 산정 모델을 개발하고, 이를 바탕으로 건설 프로젝트 공사비의 시나리오 기반 산정 및 관리 시스템을 구축하였다. 아울러 시스템 활용을 위한 공사비 산정 매뉴얼, 사용자용 시스템 매뉴얼, 운영자용 시스템 매뉴얼을 작성하였다.

또한 공사비 산정 기준인 표준품셈에 활용할 수 있는 생산성 정보를 개발하고, 건설 프로젝트(공동주택, 청사) 공사비를 위한 시나리오 기반 통합 원가 시스템에 적용 가능한 표준품셈 적용 프로세스, 시나리오 및 활용 방법론을 개발하였다.

본 연구의 성과는 다음과 같다.
Cost Estimating and Management System for Construction Projects

There is a correlation between the efficient management of a construction project budget and success of a construction project, and the estimating accuracy of a construction cost has relation to the quantity and quality of information..In the initial phase of a construction project, due to the lack of information, there is a problem that a margin of error is wide, whereas the accuracy of foresting construction costs is low. However, from the perspective of the entire life cycle, the most influential phase of a construction project is the initial phase. Therefore, making an effort to forecast construction costs accurately in the planning and programming phases is important.

In general, the unit cost of total building floor area is used in the initial planning initial phase, and construction cost is forecasted using the actual construction cost or the standard of estimate in the programming phase. In the case that the standard of estimate is used for estimating construction costs, a cost per unit area is estimated by dividing into material cost, labor cost and expenses. And, in case of material costs and labor cost, labor per unit area is used for estimating a required quantity and costs. But, many point out that this method lack practicality.

Along with the method of estimating construction costs, some issues were found in the estimating process as well. The main problem was that there was no system estimating and managing the construction costs and the budget continuously between the planning phase and the programming phase.

For the purpose of efficiently estimating and managing the construction costs for the construction of public apartment and government buildings in the planning and programming phases, we have raised construction cost estimating methodologies for the planning/programming/schematic and mater design phases as well as the factors influencing the construction costs. In addition, we have suggested the Cost Control Point (hereinafter 'CCP') which can be applied to the system by grasping the construction cost estimating and management process from the viewpoint of a client. We developed a construction cost estimating model for the application of CCP reflecting the characteristics of the public apartments and government buildings. And, based on the developed model, we built a scenario-based estimating and management system for construction costs of the construction projects. Also, we made a manual for estimating construction costs, a system manual for users and a system manual for operators for the use of the system.

In addition, we developed information on the productivity which can be used in the standard of estimate which is the standard of cost estimating, and we developed the process which can be applied to the standard of estimate, scenarios and application methodologies for scenario-based integrated costing system for construction costs of the construction projects (apartment, government buildings).

The outcome of this research is as follows.