핵융합 실증플랜트 생애주기 관리 프로세스 개발
A study on the development of Life Cycle Management Process for Nuclear fusion plant
- 연구 기간
- 2011.01.01 – 2011.12.31
- 발주 기관
- 국가핵융합연구소
연구 개요 Overview
본 연구의 목표는 원자력발전소 건설사업의 Engineering, Procurement, Construction, Start-up, Project Management (EPCSM) 단계별 As-Is 프로세스를 보완하여 핵융합 실증로 개발 Project Life Cycle Management (PLM) 체계를 정립하는 것이다.
The goal of this study is to establish a project Life Cycle Management (PLM) system for nuclear fusion proven reactor by supplementing the As-Is process at the stages of Engineering, Production, Construction, Start-up, and Project Management (EPCSM) in the nuclear power plant construction project.
연구 내용 Research Content
본 연구의 목표는 원자력발전소 건설사업의 Engineering, Procurement, Construction, Start-up, Project Management (EPCSM) 단계별 As-Is 프로세스를 보완하여 핵융합 실증로 개발 Project Life Cycle Management (PLM) 체계를 정립하는 것이다. 이를 위해 원자력발전소의 EPCSM 단계의 As-Is 프로세스를 정립하고 이를 바탕으로 핵융합 실증플랜트의 EPCSM 단계별 수행업무를 분석한다. 또한, 이에 기초하여 최종적으로 핵융합 실증플랜트 생애주기 관리 프로세스를 도출한다. 연구의 세부 목표는 다음과 같다. (1) 원자력발전소 EPCSM As-Is 프로세스 보완: 원자력발전소의 건설관리 As-Is 프로세스를 바탕으로 보완하여 EPCSM 단계별 프로세스를 규명하는 작업을 완료한다., (2) 핵융합 실증플랜트 PLM 선행연구결과 보완: KSTAR와 ITER의 As-Is 프로세스 분석을 바탕으로 핵융합 실증플랜트의 PLM과 관련한 사항을 분석하여 기존 원자력발전소와의 차이점을 도출한다., (3) 핵융합 실증플랜트 개발의 생애주기관리 프로세스 개발: 핵융합 실증플랜트와 원자력발전소와의 차이점을 바탕으로 핵융합 실증플랜트의 EPCSM 단계별 프로세스를 정립한다., (4) 플랜트 건설사업관리 시스템 개발
The goal of this study is to establish a project Life Cycle Management (PLM) system for nuclear fusion proven reactor by supplementing the As-Is process at the stages of Engineering, Production, Construction, Start-up, and Project Management (EPCSM) in the nuclear power plant construction project. To this end, the As-Is process of the EPCSM stage of the nuclear power plant is established, and based on this, the EPCSM step-by-step performance work of the nuclear fusion demonstration plant is analyzed. In addition, based on this, the process of managing the life cycle of the nuclear fusion demonstration plant is finally derived. The detailed goals of the study are as follows. (1) Compensate the nuclear power plant EPCSM As-Is process: Complete the work of identifying the EPCSM step-by-step process by supplementing the nuclear power plant's construction management As-Is process. (2) Complement the results of nuclear fusion plant PLM: analyze KSTAR and ITER to derive differences. (3) Life cycle management process development of nuclear fusion proved reactor plants: Based on the difference between nuclear fusion demonstration plants and nuclear power plants, establish EPCSM step-by-step processes of nuclear fusion demonstration plants, (4) plant construction project management system development.